Design, Supply and Install of a new Hot Water System for Lüderitz Nest Hotel


Design, Supply and Install of a new Hot Water System for Lüderitz Nest Hotel
Design, Supply and Install of a new Hot Water System for Lüderitz Nest Hotel

Lüderitz Nest Hotel Date: 2019

After close to 20 years of operation, the existing electrically heated hot water boilers were replaced. A modern, energy efficient system supplied by Stiebel Eltron was installed. The system comprises of the following:

2x heat pumps
5x 1000L hot water tanks (with electrical backup)
1x Control panel with remote monitoring and SMS alarm functionality.
2x booster pumps to feed the hotel with water during times when municipal supply is shut off

The installation has been achieved in a 3 week period. All works have been carried out with minimal interruptions to the hot water supply to the hotel. Remote monitoring of the plant in included to assist the client with possible troubleshooting, thus avoiding unnecessary trips to Lüderitz. SMS communication allows the quick reaction times of hotel maintenance personnel to act in cases of municipal water loss.